Slim Type with PFC Switching Power Supply

SKU: PRT-STPFC Category: Tags: ,

Slim Type with PFC Switching Power Supply

At Bamby Stone, we use high-quality, fanless power supplies for our backlighting LED installation projects to avoid noise.

How do we calculate the number of power supplies needed?

  • With 750W for every 16 panels, we add one more power supply.
  • With 600W for every 14 panels, we add one more power supply.
  • With 300W for every 8 panels, we add one more power supply.

$99.00$290.00

Pay via Direct Deposit, Visa, Master
Order via Online, Phone, Email
SKU: PRT-STPFC Category: Tags: ,

At Bamby Stone, we use high-quality, fanless power supplies for our backlighting LED installation projects to avoid noise.

How do we calculate the number of power supplies needed?

  • With 750W for every 16 panels, we add one more power supply.
  • With 600W for every 14 panels, we add one more power supply.
  • With 300W for every 8 panels, we add one more power supply.

Additional information

Weight 0.1 kg
Dimensions 240 × 100 × 50 mm
Power

750W, 600W, 350W

How it works?

“Planing, Payment, Timing, Production & Installation”

Quote/Invoice

Please review your quote/invoice based on the provided plans. Detailed layout technical drawings are included.

  • For projects with a timeline of less than 3 months, please pay the full invoice amount to proceed.
  • For projects exceeding 3 months, a 50% deposit is required to book your project.

Don't have measurements/plans yet? Click here to schedule a visit for measurements.

Have plans but unsure about the stone? Click here to book a showroom tour and free consultation or view our collection online.

0

Final measurements visit

After we receive your payment, you will get an email with a link to schedule your final measurement. Please choose a suitable day and time, and ensure the job site is ready for final measurements before scheduling.

Production & Installation

Once we finalize your measurements, you will receive detailed plans for confirmation. After your approval, you can schedule your installation for any date 15 working days to 6 months in advance.

}

How long all process takes?

Most of our projects are completed within a 4-week timeframe from start to finish.