Production Cost
At Bamby Stone, our team strives to simplify all calculations, ensuring that our clients can easily estimate their production costs. We provide measurements for every slab in our collection page below each stone slab. By comparing your project drawings with our slab sizes, you can determine the total size required for your project. If one slab suffices, only one production cost and one installation cost will be added to the slab cost.
$3,500.00 – $4,000.00
Price Per Slab + GST
Bamby Stone Edge Profiles
At Global Marble & Granite, we use CNC technology for precise and affordable stone benchtop edges. After CNC, we hand-finish for perfection.
Popular now are simple square edges with a rounded pencil finish, like T20 and T40, which resist chipping better. We recommend a minimum R5 radius for marble and granite. External corners are rounded to match your edge detail or requests.
Below are our most popular edge profiles.
Additional information
Edge Profiles | T20 – Square Pencil, V20 – Bullnose, 40mm – Mitred Returned, 40mm Square Pencil Round, 40mm Mitred, AM40, 40mm Sharknose, O20SQ, 40mm Bullnose, 60mm Mitred, 60mm Mitred Return, 80mm Mitred, 80mm Mitred Returned, 100mm Mitred, 100mm Mitred Return, Waterfall, Curved Waterfall Edge, Custom Undermount Sink |
---|
How it works?
“Planing, Payment, Timing, Production & Installation”
Quote/Invoice
Please review your quote/invoice based on the provided plans. Detailed layout technical drawings are included.
- For projects with a timeline of less than 3 months, please pay the full invoice amount to proceed.
- For projects exceeding 3 months, a 50% deposit is required to book your project.
Don't have measurements/plans yet? Click here to schedule a visit for measurements.
Have plans but unsure about the stone? Click here to book a showroom tour and free consultation or view our collection online.
Final measurements visit
After we receive your payment, you will get an email with a link to schedule your final measurement. Please choose a suitable day and time, and ensure the job site is ready for final measurements before scheduling.
Production & Installation
Once we finalize your measurements, you will receive detailed plans for confirmation. After your approval, you can schedule your installation for any date 15 working days to 6 months in advance.
How long all process takes?
Most of our projects are completed within a 4-week timeframe from start to finish.