Lumena
504 Lumena features a pearl-white honed surface with crackling grey veining, perfect for benchtops, vanities, splashbacks, and feature walls.
Price range: $702.00 through $1,098.00
Price Per Slab + GST
504 Lumena is a refined porcelain surface defined by its pearl-white base and delicate crackling grey veining. The intersecting lines echo the natural aging of marble, while the honed finish lends a soft, matte texture that enhances its timeless elegance. The slight surface lustre catches light subtly, adding depth and sophistication to both traditional and contemporary spaces. Crafted for high performance, Lumena is engineered for durability, resisting stains, scratches, and heat while delivering a premium look that pairs effortlessly with various design styles.
Additional information
| Weight | 160 kg |
|---|---|
| Dimensions | 12 × 3200 × 1560 mm |
| Thickness | 12mm, 20mm |
| Colors | White, Grey, Beige |
| Country of Origin | Israel |
| Material | Porcelain |
| Pattern Match | Continuous |
| Stone Kind | Marble |
| Surface | Honed |
⚠ Note:
❌ “stone kind” — Porcelain, engineered, and sintered stones are not natural stones; their “stone kind” is based on appearance.
❌ “outdoor use” — Engineered stones suit indoor use only; heat, sun, and outdoor conditions can affect colour and performance.
✅ “outdoor use” — Natural, Porcelain and sintered stones are suitable for outdoor use.
✅ How to Estimate Your Slab, Production & Installation Cost at Bamby Stone?
🧰 Step 1: Open the Calculator
📏 Step 2: Enter Your Stone Measurements
🧮 Step 3: Add Production Cost
🛠️ Step 4: Add Installation Cost
✨ Let’s Bring It to Life
⏱️ How long does it take?
Most projects are completed within 4 weeks from start to finish.
Send us your plans or book a showroom visit to choose your stone. We’ll provide a detailed quote with layout drawings.
Once you're ready to proceed, you'll receive a link to schedule final on-site measurements. The site must be installation-ready.
Templating is confirmed! You will be receiving a link to schedule installation date for us to complete the project.












