RGBW RGBCCT Repeater Amplifier 25A EV5

We use power amplifiers to distribute energy evenly and reduce heat in our panel installations. One amplifier is used for every 8 panels.

$99.00

13 in stock

Pay via Direct Deposit, Visa, Master
Order via Online, Phone, Email
SKU: PRT-RGBRA Category:

EV5 25A Power Repeater / Amplifier

We use power amplifiers to distribute energy evenly and reduce heat in our panel installations. One amplifier is used for every 8 panels.

This RGBW, RGBCCT LED strip light repeater/amplifier can expand a controller’s capacity up to 25A. By using an amplifier, all functions of the controller are replicated through to the LED strip connected to the repeater.

An unlimited number of repeaters can be connected to one controller. A single driver can be connected to both the controller and the repeater, or individual drivers can be used.

FEATURES:

  • Output power:
    • Total: 25A (300W) @ 12V / 25A (600W) @ 24V
    • 5/Ch: 5A/Ch (60W) @ 12V / 5A/Ch (120W) @ 24V
  • Output type: constant voltage (not PWM)

Additional information

Weight 1 kg
Dimensions 30 × 50 × 20 mm

How it works?

“Planing, Payment, Timing, Production & Installation”

Quote/Invoice

Please review your quote/invoice based on the provided plans. Detailed layout technical drawings are included.

  • For projects with a timeline of less than 3 months, please pay the full invoice amount to proceed.
  • For projects exceeding 3 months, a 50% deposit is required to book your project.

Don't have measurements/plans yet? Click here to schedule a visit for measurements.

Have plans but unsure about the stone? Click here to book a showroom tour and free consultation or view our collection online.

0

Final measurements visit

After we receive your payment, you will get an email with a link to schedule your final measurement. Please choose a suitable day and time, and ensure the job site is ready for final measurements before scheduling.

Production & Installation

Once we finalize your measurements, you will receive detailed plans for confirmation. After your approval, you can schedule your installation for any date 15 working days to 6 months in advance.

}

How long all process takes?

Most of our projects are completed within a 4-week timeframe from start to finish.